The objective is: 
203114
The running time is: 
1385.99
The time meeting best is: 
1249.12
Location: 2(load: 490) 
 Route 0(load: 60) 96 93 60 67 
 Route 1(load: 142) 90 64 63 61 97 76 66 89 94 
 Route 2(load: 143) 72 69 99 80 91 70 82 65 68 
 Route 3(load: 145) 88 87 85 79 73 84 98 95 81 75 
Location: 3(load: 560) 
 Route 0(load: 144) 48 14 1 26 12 20 10 51 38 42 
 Route 1(load: 149) 46 43 36 30 53 39 44 33 54 
 Route 2(load: 122) 58 57 40 32 47 31 34 50 
 Route 3(load: 145) 49 41 45 37 59 56 55 35 52 
Location: 9(load: 490) 
 Route 0(load: 149) 6 18 11 7 13 19 9 5 0 17 
 Route 1(load: 84) 22 3 8 23 2 
 Route 2(load: 145) 28 25 16 27 4 29 24 15 21 
 Route 3(load: 112) 77 74 62 71 78 83 86 92 
The actual cost is 203114